COMPLETED PROJECT
Ogbakiri Internal Roads, Emohua Local Government Area, Rivers State.
DATE OF COMPLETION: 7th September 2023
Description of Work:
The works include the construction of a 15km single carriageway of 8m width.
It shall be made up of, 700 mm sharp sand sub base, 200 mm crushed stone base and 50mm asphaltic concrete binder course and 50mm asphaltic concrete wearing course.
This also includes the construction of side drains and box culverts.
Rehabilitaion/upgrading of babajide sanwo-olu ROAD (dopemu road) in agege local government area of Lagos State
date of award: august, 2021
Description of Work:
The project involves the reconstruction of a single carriageway of 11.6m width and approximately 2Km length.
The carriageway will be made up of 150mm crushed stone including stone dust as base course, lateritic material as sub-base not exceeding the compacted thickness of 0.3m and 40mm asphaltic concrete wearing course (ACWC).
There will be the construction of box culverts and drains where necessary.
Construction of Amansea-Ebenebe-Ugbenu-Ugbene-Awba Ofemili Road, Anambra State Phase 1 (Distance 25.585KM).
DATE OF AWARD: September, 2022
Description of Work:
Construction/reconstruction of 25.585 Km single carriageway and 7.3m width. The works include
earthworks, surface dressed shoulders, 200mm crushed stone base, asphaltic concrete pavement,
concrete pipe culverts and side drains.
Construction of Abiola-Onijemo Link Road with Bridge in Ifako Ijaiye Local Government Area, Lagos State.
DATE OF AWARD: May, 2022
Description of Work:
Construction of a 650m length, road connecting 6 adjoining roads. This project consists of 210m bridge,
earthworks, 200mm crushed stone base, asphaltic binder and wearing course and hydraulic structures -
box culverts, u-covered drains and other erosion control works.
Rehabilitation/Upgrading of Ilabere, Ilu and Inupa Roads in Ikoyi, Eti-Osa, Local Government Area, Lagos State.
Date of Award: 10th May 2023
Description of Work:
This project entails the reconstruction and upgrading of the existing 1600 m asphalt single carriageway to an interlocking pavement.
The scope of work involves site clearance, relocation of electrical and water services, earthworks, box culverts and u-covered drains, interlocking pavement, lane marking and installation of streetlights